Sizing & Specs * Installation Instructions * Sales Reps * End Users * UL Certification
 
Installation Instructions for PER FIT® WT Cable Connectors
WT
Gland Nut
Gland
WT Body
Seal Ring
Locknut
Bushing
JACKET STRIP LENGTH  
  1. Remove enough jacket and armor from the end of the cable to allow wire leads long enough to make connections to equipment.
  2. Remove sufficient amount of jacket to allow for making a good grounding bond of the armor to connector.
  3. OMIT THIS STEP IF NOT USING SLEEVE!* Slip heat shrinkable sleeve over cable before installing the connector into the equipment. Do Not apply heat to sleeve at this time.
  4. Loosen gland nut without removing. Screw the connector onto the cable making sure it is tight enough to make a good bond. Tighten gland nut with channel locks or strap wrench until tight (gland firmly contacts PVC jacket on cable).
  5. Remove locknut and bushing. Install cable leads and connector thru knockout hole into equipment or box. Be sure seal ring is between connector body and outside of box. Reinstall locknut (with teeth pointing towards the connector) and bushing.
  6. OMIT THIS STEP IF NOT USING SLEEVE! Slip heat shrinkable sleeve over cable and connector and apply heat to shrink the sleeve.

CLICK TO VIEW IN .PDF Adobe

*Note: Heat shrinkable sleeves only protect the connector from corrosives, they are not necessary for water tightness.

     
Hub Size (inches) Strip Length (inches)  
1/2
3/4
1
1-1/4
1-1/2
2
2-1/2
3
3-1/2
4
7/8
7/8
1-1/4
1-1/4
1-1/2
2-1/8
2-3/16
2-3/16
2-3/8
2-3/8