| JACKET STRIP LENGTH |
|
-
Remove enough jacket and armor from the end of the cable to allow wire leads long enough to make connections to equipment.
-
Remove sufficient amount of jacket to allow for making a good grounding bond of the armor to connector.
-
OMIT THIS STEP IF NOT USING SLEEVE!* Slip heat shrinkable sleeve over cable before installing the connector into the equipment. Do Not apply heat to sleeve at this time.
-
Screw connector body onto the cable making sure it is tight enough to make a good bond.
-
Without removing the male hub and hub nut from connector, loosen the hub nut and screw the male hub into a threaded entrance on the equipment. With channel locks tighten hub and then tighten hub nut on connector.
-
OMIT THIS STEP IF NOT USING SLEEVE! Slip heat shrinkable sleeve over cable and connector and apply heat to shrink the sleeve.
CLICK TO VIEW INSTRUCTIONS IN .PDF  |
| |
|
| Hub Size (inches) |
Strip Length (inches) |
1/2
3/4
1
1-1/4
1-1/2
2
2-1/2
3
3-1/2
4 |
7/8
7/8
1-1/4
1-1/4
1-1/2
2-1/8
2-3/16
2-3/16
2-3/8
2-3/8 |
|
| |
| |
| |
| |
|
|
*Note: Heat shrinkable sleeves only protect the connector from corrosives, it does not make this connector water tight.